Discover
Build a clear view of the OT connectivity, network boundaries, dependencies and applications that needed to remain integrated through the transition.
Case study ยท Critical infrastructure
Industrial OT connectivity at a remote UK processing facility was transitioned through controlled testing, with the agreed application testing completed successfully.
The client had to move industrial OT connectivity at a remote UK processing facility without losing the operational integration the site depends on.
Build a clear view of the OT connectivity, network boundaries, dependencies and applications that needed to remain integrated through the transition.
Define the cutover approach, readiness requirements and agreed test set needed to validate the new operating state.
Coordinate the operational cutover, technical dependencies and controlled application and connectivity testing.
Establish the agreed connectivity in the new operating environment and validate the required integrations before acceptance.
The agreed test set was completed and closed, with the required operational integrations maintained through the cutover.